top of page

Agreement No. CE 7/2011 (HY) - Tuen Mun – Chek Lap Kok Link - Design and Construction

Highways Department


The project comprises a 5 km subsea tunnel linkage between Tuen Mun and Lantau across busy Urmston Road and a 1.6 km long sea viaduct bridge connection to North Lantau Highway (NLH).


Axon was appointed as the Marine Traffic Consultant to review the key marine construction activities associated with the Works including Tunnel Boring Machine (TBM) operations, viaducts lifting and seawall constructions, reclamations adjacent to River Trade Terminal (RTT), northern and southern landfalls for the TBM, re-provisioning of government berths and associated facilities at RTT and dredging operations.


TMCLK-pic3-northern-portal.jpg

標記:

Featured Posts
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page